image description

Sample Design: CTWS Mill Creek Action Effectiveness Monitoring

Sample Design: CTWS Mill Creek Action Effectiveness Monitoring
ID: 79
State: Finalized
  • State: Finalized
  • Owner: Chris Moan
  • Spatial Design Category: Ease of Access
  • Data Repository: <none>
  • Sites in Design: 2
  • Has Location Privacy: No

Expand All | Collapse All


The details of this Sample Design, including all the parameters used to generate it, are included below. Sample designs must belong to a Study Design.

Description

Data collection is part of the Action Effectiveness Monitoring instigated by BPA. A large scale habitat restoration project is planned on Mill Creek, transitioning a relict mill pond location back to a more functional river system. Two sites will be surveyed following BPA's "Protocol for Monitoring the Effectiveness of Off-Channel Habitat / Floodplain Enhancement Projects." One site will be located within the project area while the other will be located outside the scope of work and will serve as a control.

 

 

 

Sample Design Parameters

  • 1 Panel
  • Is categorized

Start Year

2013

Study Design

<none>

Photos

<none>

Documents

<none>

Map of Sites

Stratum Panel Occasion

Below is a list of User Samples from which this design is drawing sites.


Panel designs can help address sampling objectives by increasing the total number of samples at a lower overall cost. A common panel structure involves one or more panels with a high revisit frequency (e.g. an “Annual” panel), and other panels with a lower revisit frequency (e.g. a three year “Rotating” panel).

Panel Sampling Occasion (10 Year(s))
# Panel Name Panel Abbr. 1 2 3 4 5 6 7 8 9 10
1
Action Effectiveness Monitoring
AEM

Shapefile

Download

Distribution

The histogram charts below show the distribution of this sample design’s sites across the various panels and strata.