Repository: QCI Network Database
- ID: 1173
- Created by: Jacque Schei
- Created: 1/31/2014 11:53 AM
- Updated by:
- Updated:
QCI Network Database
Independent
<none>
https://www.qcinc.org/filebase/
Managers, Researchers
<none>
Administrators
- Jody White (jody@qcinc.org)
Organizations
Identifier
d0ab9b7f-c15c-4111-8293-6ac452e00bc4
The following items are associated with this Environmental Information Repository.
Who’s Using this Repository?
Sample Designs
- Operate smolt traps - US Fish and Wildlife Service (USFWS)
- Analyze population dynamics at restoration sites vs. unrestored sites - US Forest Service (USFS)
- Conduct juvenile shocking and PIT tagging activities in Bridge Creek IMW - Eco Logical Research 1
- Collect field data for monitoring BDS structures and vegetation in Bridge Creek - South Fork Research
- Task 4A: Operate ISEMP screw traps in the South Fork Salmon River. - Quantitative Consultants Inc
- Operate and maintain PIT tag arrays - Washington Department of Fish and Wildlife (WDFW): ISEMP Protocol
- Task 6: Lower Granite Dam adult and tributary juvenile salmonid scale analysis - Quantitative Consultants Inc 1
- Task 3: Operate and Maintain ISEMP IPTDS. - Quantitative Consultants Inc
- Develop and test methods to calculate instantaneous and periodic PIT tag array efficiency. - Quantitative Consultants Inc
- Task 4B: Operate ISEMP screw traps in the Lemhi River. - Quantitative Consultants Inc
- ISEMP Regional Data Analysis - Quantitative Consultants Inc 1
- ISEMP Salmon subbasin data analysis - Quantitative Consultants Inc
- 13.9 Fish Habitat Status and Trend Monitoring in two subbasins - Terraqua, Inc.
- RMRS: Lemhi Hydrologic Modeling Using LiDAR Data - Idaho Office of Species Conservation
- RMRS: Lemhi Hydrologic Modeling - Data Collection on Lower part of the Lemhi River - Idaho Office of Species Conservation
- RMRS: Lemhi Hydrologic Modeling - Data Collection - Idaho Office of Species Conservation
- Conduct nighttime winter snorkel surveys - Oregon Department of Fish and Wildlife
- Develop/validate winter Chinook salmon and steelhead QRF model - Oregon Department of Fish and Wildlife
- 13.9 Fish Habitat Status and Trend Monitoring in two subbasins - Terraqua, Inc., cloned for Study Plan 125
- Project: 2003-017-00, Contract: 56336, Work Statement Element: Work Element E: 157 - Operate smolt traps
- Project: 2003-017-00, Contract: 57497, Work Statement Element: Work Element D: 162 - Analyze population dynamics at restoration sites vs. unrestored sites
- Project: 2003-017-00, Contract: 55487, Work Statement Element: Work Element H: 157 - Task 3: Operate and Maintain ISEMP IPTDS.
- Project: 2003-017-00, Contract: 55487, Work Statement Element: Work Element I: 157 - Task 4A: Operate ISEMP screw traps in the South Fork Salmon River.
- Project: 2003-017-00, Contract: 55487, Work Statement Element: Work Element J: 157 - Task 4B: Operate ISEMP screw traps in the Lemhi River.
- Project: 2003-017-00, Contract: 55487, Work Statement Element: Work Element L: 157 - Task 6: Lower Granite Dam adult and tributary juvenile salmonid scale analysis
- Project: 2003-017-00, Contract: 55487, Work Statement Element: Work Element W: 162 - Develop and test methods to calculate instantaneous and periodic PIT tag array efficiency.
- Project: 2003-017-00, Contract: 55487, Work Statement Element: Work Element X: 162 - ISEMP Salmon subbasin data analysis
- Project: 2003-017-00, Contract: 55487, Work Statement Element: Work Element Y: 162 - ISEMP Regional Data Analysis
- Project: 2003-017-00, Contract: 55969, Work Statement Element: Work Element J: 157 - Collect field data for monitoring BDS structures and vegetation in Bridge Creek
- Project: 2003-017-00, Contract: 57863, Work Statement Element: Work Element I: 157 - 13.9 Fish Habitat Status and Trend Monitoring in two subbasins
- Project: 2008-507-00, Contract: 66762, Work Statement Element: Work Element F: 160 - Data management tools developed and/or updated and/or identified to meet tribal needs.
- Project: 2010-072-00, Contract: 67754, Work Statement Element: Work Element AP: 162 - RMRS: Lemhi Hydrologic Modeling Using LiDAR Data
- Project: 2008-507-00, Contract: 70127, Work Statement Element: Work Element F: 160 - Data management tools developed and/or updated and/or identified to meet tribal needs.
- Project: 2010-072-00, Contract: 75750, Work Statement Element: Work Element R: 162 - RMRS: Lemhi Hydrologic Modeling Using LiDAR Data 2017
- Project: 2010-072-00, Contract: 71307, Work Statement Element: Work Element AF: 162 - RMRS: Lemhi Hydrologic Modeling Using LiDAR Data
- Project: 2010-072-00, Contract: 75750, Work Statement Element: Work Element S: 157 - RMRS: Lemhi Hydrologic Modeling - Data Collection on Lower part of the Lemhi River
- Project: 2010-034-00, Contract: 74314 REL 5, Work Statement Element: Work Element F: 157 - Operate and maintain PIT tag arrays
- Project: 2003-017-00, Contract: 74647, Work Statement Element: Work Element P: 157 - Conduct juvenile shocking and PIT tagging activities in Bridge Creek IMW
- Project: 2018-002-00, Contract: 77087, Work Statement Element: Work Element F: 159 - Upload, parse, report, and summarize IPTDS data.
- Project: 2010-072-00, Contract: 76913 REL 1, Work Statement Element: Work Element AK: 162 - RMRS: Lemhi Hydrologic Modeling 2018
- Project: 2010-072-00, Contract: 76913 REL 1, Work Statement Element: Work Element AJ: 157 - RMRS: Lemhi Hydrologic Modeling - Data Collection
- Project: 2011-006-00, Contract: 75382, Work Statement Element: Work Element I: 157 - Conduct nighttime winter snorkel surveys
- Project: 2011-006-00, Contract: 75382, Work Statement Element: Work Element K: 162 - Develop/validate winter Chinook salmon and steelhead QRF model
- Project: 2008-507-00, Contract: 73789, Work Statement Element: Work Element E: 160 - Data management tools developed and/or updated and/or identified to meet tribal needs.
- Project: 2018-002-00, Contract: 80535, Work Statement Element: Work Element F: 159 - Upload, parse, report, and summarize IPTDS data.
- Project: 2018-002-00, Contract: 83489, Work Statement Element: Work Element F: 159 - Upload, parse, report, and summarize IPTDS data.
- Project: 2003-017-00, Contract: 33329, Work Statement Element: Work Element B: 157 - Operate smolt traps
- Project: 2003-017-00, Contract: 36687, Work Statement Element: Work Element E: 157 - Operate smolt traps
- Project: 2003-017-00, Contract: 41045, Work Statement Element: Work Element E: 157 - Operate smolt traps
- Project: 2003-017-00, Contract: 40950, Work Statement Element: Work Element O: 157 - Task 4A: Operate ISEMP screw traps in South Fork Salmon River.
- Project: 2003-017-00, Contract: 45428, Work Statement Element: Work Element M: 157 - Task 4A: Operate ISEMP screw traps in South Fork Salmon River.
- Project: 2003-017-00, Contract: 45993, Work Statement Element: Work Element E: 157 - Operate smolt traps
- Project: 2003-017-00, Contract: 50585, Work Statement Element: Work Element M: 157 - Task 4A: Operate ISEMP screw traps in South Fork Salmon River.
- Project: 2003-017-00, Contract: 51487, Work Statement Element: Work Element C: 157 - Operate smolt traps
- Project: 2003-017-00, Contract: 59729, Work Statement Element: Work Element G: 157 - Task 3: Operate and Maintain ISEMP IPTDS.
- Project: 2003-017-00, Contract: 59729, Work Statement Element: Work Element H: 157 - Task 4A: Operate ISEMP screw traps in the South Fork Salmon River.
- Project: 2003-017-00, Contract: 59729, Work Statement Element: Work Element I: 157 - Task 4B: Operate ISEMP screw traps in the Lemhi River.
- Project: 2003-017-00, Contract: 59729, Work Statement Element: Work Element K: 157 - Task 6: Lower Granite Dam adult and tributary juvenile salmonid scale analysis
- Project: 2003-017-00, Contract: 59729, Work Statement Element: Work Element S: 162 - Develop and test methods to calculate instantaneous and periodic PIT tag array efficiency.
- Project: 2003-017-00, Contract: 59729, Work Statement Element: Work Element T: 162 - ISEMP Salmon subbasin data analysis
- Project: 2003-017-00, Contract: 59729, Work Statement Element: Work Element U: 162 - ISEMP Regional Data Analysis
- Project: 2003-017-00, Contract: 59870, Work Statement Element: Work Element E: 157 - Operate smolt traps
- Project: 2003-017-00, Contract: 61818, Work Statement Element: Work Element H: 157 - 15.9 Fish Habitat Status and Trend Monitoring in two subbasins
- Project: 2003-017-00, Contract: 64146, Work Statement Element: Work Element F: 157 - Task 3: Operate and Maintain ISEMP IPTDS.
- Project: 2003-017-00, Contract: 64146, Work Statement Element: Work Element H: 157 - Task 4B: Operate ISEMP screw traps in the Lemhi River.
- Project: 2003-017-00, Contract: 64146, Work Statement Element: Work Element J: 157 - Task 6: Lower Granite Dam adult and tributary juvenile salmonid scale analysis
- Project: 2003-017-00, Contract: 64146, Work Statement Element: Work Element P: 162 - ISEMP Salmon subbasin data analysis
- Project: 2003-017-00, Contract: 64146, Work Statement Element: Work Element Q: 162 - ISEMP Regional Data Analysis
- Project: 2003-017-00, Contract: 64187, Work Statement Element: Work Element E: 157 - Operate smolt traps
- Project: 2003-017-00, Contract: 65674, Work Statement Element: Work Element L: 157 - 17.9 Fish Habitat Status and Trend Monitoring in two subbasins
- Project: 2003-017-00, Contract: 67442, Work Statement Element: Work Element M: 162 - Task 8: ISEMP Salmon subbasin data analysis
- Project: 2003-017-00, Contract: 67442, Work Statement Element: Work Element N: 162 - Task 9: ISEMP Regional Data Analysis
- Project: 2003-017-00, Contract: 67971, Work Statement Element: Work Element E: 157 - Operate smolt traps
- Project: 2003-017-00, Contract: 69875, Work Statement Element: Work Element G: 157 - 19.9 Fish Habitat Status and Trend Monitoring in two subbasins
- Project: 2010-034-00, Contract: 69402, Work Statement Element: Work Element H: 157 - Operate and maintain PIT tag arrays
- Project: 2003-017-00, Contract: 71131, Work Statement Element: Work Element L: 162 - Task 8: ISEMP Salmon subbasin data analysis
- Project: 2003-017-00, Contract: 71131, Work Statement Element: Work Element M: 162 - Task 9: ISEMP Regional Data Analysis
- Project: 2003-017-00, Contract: 71541, Work Statement Element: Work Element D: 157 - Operate smolt traps
- Project: 2010-034-00, Contract: 72749, Work Statement Element: Work Element E: 157 - Operate and maintain PIT tag arrays
- Project: 2003-017-00, Contract: 74633, Work Statement Element: Work Element R: 162 - Life Cycle Modeling (Priorities 2.1.1-2.2.1, 2.3.1-2.3.3, and 5.3)
- Project: 2003-017-00, Contract: 74633, Work Statement Element: Work Element S: 162 - Quantitative framework to estimate effect size of restoration actions (priorities 3.1-3.3)
- Project: 2003-017-00, Contract: 74633, Work Statement Element: Work Element T: 162 - Quantile Regression Forest development, improvement, and validation (Priority 3.5)
