Repository: WDFW R-5 TWS
- ID: 1176
- Created by: Jacque Schei
- Created: 6/20/2014 8:11 AM
- Updated by: Sam Cimino
- Updated: 9/3/2025 10:35 AM
WDFW R-5 TWS
Independent
Regional database housing a variety of raw survey count data, redd counts, age information, and associated spatial data for salmonid surveys and trap and weir counts.
funders
Data not publicly available. For additional information contact Administrator.
Admin: Danny Warren, danny.warren@dfw.wa.gov
Administrators
<none>
Organizations
Identifier
061dd8ee-a7a1-413b-8390-69b7907db510
The following items are associated with this Environmental Information Repository.
Who’s Using this Repository?
Sample Designs
- WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries - Washington Department of Fish and Wildlife (WDFW)
- WDFW Steelhead Spawning Surveys in the upper Tucannon River - Washington Department of Fish and Wildlife (WDFW)
- Conduct steelhead and bull trout spawner surveys - Yakama Confederated Tribes
- Conduct steelhead spawning surveys in Toppenish Creek - Yakama Nation
- Collect adult abundance data via mark-resight - Washington Department of Fish and Wildlife (WDFW)
- Chinook Salmon Spawning Ground Surveys in the mainstem - Pacific States Marine Fisheries Commission
- Spawning ground surveys (redd counts) - Yakama Confederated Tribes
- Adult salmonid monitoring - Yakama Confederated Tribes
- Chinook Spawning Ground Surveys - Pacific States Marine Fisheries Commission
- Summarize & Analyze Chinook spawning data - Pacific States Marine Fisheries Commission
- Chinook Spawning Ground Surveys - PSMFC_5
- Chinook Spawning Ground Surveys - PSMFC_6
- Sample Chinook returning to state hatcheries - Washington Department of Fish and Wildlife (WDFW)
- Coho Spawning Ground Surveys - Washington Department of Fish and Wildlife (WDFW)
- Chinook Spawning Ground Surveys - Washington Department of Fish and Wildlife (WDFW)
- Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging (PSMFC) - Washington Department of Fish and Wildlife (WDFW)
- Adult trap monitoring at Duncan Creek - Washington Department of Fish and Wildlife (WDFW)
- Spawning ground surveys & sampling/marking for spawner population estimates via live tagging - Washington Department of Fish and Wildlife (WDFW)
- Spawning ground surveys & sampling in areas with low chum salmon spawner abundance - Washington Department of Fish and Wildlife (WDFW)
- WDFW Adult Enumeration: Weir Operation for Asotin & Tucannon Steelhead populations - Washington Department of Fish and Wildlife (WDFW)
- Adult salmonid monitoring - Yakama Confederated Tribes
- Chum Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging (PSMFC) - Washington Department of Fish and Wildlife (WDFW)
- Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging (PSMFC) - Washington Department of Fish and Wildlife (WDFW)V2
- Project: 2010-036-00, Contract: 64528, Work Statement Element: Work Element E: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 64528, Work Statement Element: Work Element F: 157 - Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 64528, Work Statement Element: Work Element G: 157 - Sample Chinook returning to state hatcheries
- Project: 2010-036-00, Contract: 64528, Work Statement Element: Work Element J: 160 - Modify, Manage, & Maintain Fishery & Escapement Sampling Databases
- Project: 2010-036-00, Contract: 69257, Work Statement Element: Work Element E: 157 - Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 69257, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 69257, Work Statement Element: Work Element H: 160 - Modify, Manage, & Maintain Fishery & Escapement Sampling Databases
- Project: 2010-036-00, Contract: 69257, Work Statement Element: Work Element I: 159 - Transfer of PIT Tag Data, CWT data and Esc Data to appropriate database
- Project: 2010-036-00, Contract: 69257, Work Statement Element: Work Element K: 162 - Summarize & Analyze Chinook spawning data
- Project: 1999-003-01, Contract: 70625, Work Statement Element: Work Element B: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2010-036-00, Contract: 72994, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 72994, Work Statement Element: Work Element E: 157 - Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 72994, Work Statement Element: Work Element H: 160 - Modify, Manage, & Maintain Fishery & Escapement Sampling Databases
- Project: 2010-036-00, Contract: 72994, Work Statement Element: Work Element I: 159 - Transfer of PIT Tag Data, CWT data and Esc Data to appropriate database
- Project: 2010-036-00, Contract: 72994, Work Statement Element: Work Element K: 162 - Summarize & Analyze Chinook spawning data
- Project: 1999-003-01, Contract: 73877, Work Statement Element: Work Element B: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2010-036-00, Contract: 76302, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 76302, Work Statement Element: Work Element E: 157 - Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 76302, Work Statement Element: Work Element H: 160 - Modify, Manage, & Maintain Fishery & Escapement Sampling Databases
- Project: 2010-036-00, Contract: 76302, Work Statement Element: Work Element I: 159 - Transfer of PIT Tag Data, CWT data and Esc Data to appropriate database
- Project: 2010-036-00, Contract: 76302, Work Statement Element: Work Element K: 162 - Summarize & Analyze Chinook spawning data
- Project: 2010-036-00, Contract: 74314 REL 7, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 74314 REL 7, Work Statement Element: Work Element E: 157 - Chinook Spawning Ground Surveys
- Project: 1999-003-01, Contract: 77529, Work Statement Element: Work Element B: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2010-036-00, Contract: 74314 REL 42, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 74314 REL 42, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 6, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 6, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 1999-003-01, Contract: 78040 REL 8, Work Statement Element: Work Element C: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2010-036-00, Contract: 78040 REL 16, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 16, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 74314 REL 75, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 74314 REL 75, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 1999-003-01, Contract: 78040 REL 18, Work Statement Element: Work Element C: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 1999-003-01, Contract: CR-335972, Work Statement Element: Work Element C: 157 - COPY: Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2010-036-00, Contract: 74314 REL 111, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 74314 REL 111, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 28, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 28, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 1999-003-01, Contract: 78040 REL 30, Work Statement Element: Work Element C: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2010-036-00, Contract: 74314 REL 140, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 74314 REL 140, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 38, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 38, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2008-710-00, Contract: 74314 REL 143, Work Statement Element: Work Element D: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging
- Project: 1999-003-01, Contract: 78040 REL 39, Work Statement Element: Work Element C: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2008-710-00, Contract: 84042 REL 8, Work Statement Element: Work Element D: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging
- Project: 2010-036-00, Contract: 84042 REL 10, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 84042 REL 10, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 49, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 49, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 1999-003-01, Contract: 78040 REL 51, Work Statement Element: Work Element C: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 1999-003-01, Contract: 29301, Work Statement Element: Work Element B: 157 - Fall Chinook Salmon Spawning Ground Surveys
- Project: 1999-003-01, Contract: 29301, Work Statement Element: Work Element G: 157 - Chum Salmon Spawning Ground Surveys in the mainstem
- Project: 1995-063-35, Contract: 34960, Work Statement Element: Work Element A: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 34960, Work Statement Element: Work Element B: 157 - Adult salmonid monitoring at Lyle Falls Fishway
- Project: 1999-003-01, Contract: 34890, Work Statement Element: Work Element B: 157 - Chum Salmon Spawning Ground Surveys in the mainstem
- Project: 1995-063-35, Contract: 37986, Work Statement Element: Work Element A: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 37986, Work Statement Element: Work Element B: 157 - Adult salmonid monitoring
- Project: 1999-003-01, Contract: 38971, Work Statement Element: Work Element B: 157 - Chum Salmon Spawning Ground Surveys in the mainstem
- Project: 1995-063-35, Contract: 37986, Work Statement Element: Work Element W: 157 - Spawning ground surveys (redd counts) Expanded Funds
- Project: 1995-063-35, Contract: 37986, Work Statement Element: Work Element X: 157 - Adult salmonid monitoring Expanded Funds
- Project: 1995-063-35, Contract: 42481, Work Statement Element: Work Element B: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 42481, Work Statement Element: Work Element C: 157 - Adult salmonid monitoring
- Project: 1995-063-35, Contract: 42481, Work Statement Element: Work Element AB: 157 - Spawning ground surveys (redd counts) - Year 2
- Project: 1995-063-35, Contract: 42481, Work Statement Element: Work Element AC: 157 - Adult salmonid monitoring - Year 2
- Project: 1999-003-01, Contract: 44312, Work Statement Element: Work Element D: 157 - Chum Salmon Spawning Ground Surveys in the mainstem
- Project: 1999-003-01, Contract: 44312, Work Statement Element: Work Element C: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2008-710-00, Contract: 50204, Work Statement Element: Work Element C: 157 - FFY11 -Sampling/marking for spawner population est., Col. R. and select WA tribs: I-205 to Bonnl
- Project: 1999-003-01, Contract: 49534, Work Statement Element: Work Element B: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 1995-063-35, Contract: 53312, Work Statement Element: Work Element A: 157 - Spawning ground surveys (redd counts) - Year 1
- Project: 1995-063-35, Contract: 53312, Work Statement Element: Work Element B: 157 - Adult salmonid monitoring - Year 1
- Project: 1998-019-00, Contract: 54272, Work Statement Element: Work Element E: 157 - Collect adult abundance data via mark-resight
- Project: 1995-063-35, Contract: 53312, Work Statement Element: Work Element X: 157 - Spawning ground surveys (redd counts) - Year 2
- Project: 1995-063-35, Contract: 53312, Work Statement Element: Work Element Y: 157 - Adult salmonid monitoring - Year 2
- Project: 1999-003-01, Contract: 54644, Work Statement Element: Work Element B: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2008-710-00, Contract: 50204, Work Statement Element: Work Element BG: 157 - FFY12 - Sampling/marking for spawner population est., Col. R. and select WA tribs: I-205 to Bonn
- Project: 1996-035-01, Contract: 57335, Work Statement Element: Work Element L: 157 - Conduct spawner surveys
- Project: 2010-036-00, Contract: 57287, Work Statement Element: Work Element E: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 57287, Work Statement Element: Work Element G: 157 - Sample Chinook returning to state hatcheries
- Project: 2010-036-00, Contract: 57287, Work Statement Element: Work Element F: 157 - Chinook Spawning Ground Surveys
- Project: 1998-019-00, Contract: 58664, Work Statement Element: Work Element E: 157 - Collect adult abundance data via mark-resight
- Project: 2008-710-00, Contract: 59958, Work Statement Element: Work Element D: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 59958, Work Statement Element: Work Element E: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 59958, Work Statement Element: Work Element I: 157 - Adult trap monitoring at Duncan Creek
- Project: 1999-003-01, Contract: 59478, Work Statement Element: Work Element B: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2010-036-00, Contract: 61015, Work Statement Element: Work Element E: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 61015, Work Statement Element: Work Element F: 157 - Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 61015, Work Statement Element: Work Element G: 157 - Sample Chinook returning to state hatcheries
- Project: 1996-035-01, Contract: 56662 REL 15, Work Statement Element: Work Element L: 157 - Conduct spawner surveys
- Project: 1995-063-35, Contract: 56662 REL 19, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 19, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 1998-019-00, Contract: 62516, Work Statement Element: Work Element F: 157 - Collect adult abundance data via mark-resight
- Project: 1996-035-01, Contract: 56662 REL 50, Work Statement Element: Work Element J: 157 - Conduct spawner surveys
- Project: 2008-710-00, Contract: 63377, Work Statement Element: Work Element D: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 63377, Work Statement Element: Work Element E: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 63377, Work Statement Element: Work Element I: 157 - Adult trap monitoring at Duncan Creek
- Project: 1999-003-01, Contract: 63058, Work Statement Element: Work Element A: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 1995-063-35, Contract: 56662 REL 56, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 56, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 1998-019-00, Contract: 66154, Work Statement Element: Work Element F: 157 - Collect adult abundance data via mark-resight
- Project: 1996-035-01, Contract: 56662 REL 64, Work Statement Element: Work Element D: 157 - Conduct steelhead spawning surveys in Toppenish Creek
- Project: 1999-003-01, Contract: 66561, Work Statement Element: Work Element B: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2008-710-00, Contract: 67595, Work Statement Element: Work Element D: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 67595, Work Statement Element: Work Element E: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 67595, Work Statement Element: Work Element I: 157 - Adult trap monitoring at Duncan Creek
- Project: 1996-035-01, Contract: 56662 REL 77, Work Statement Element: Work Element K: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 2010-036-00, Contract: 69142, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 69142, Work Statement Element: Work Element E: 157 - Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 69142, Work Statement Element: Work Element F: 157 - Sample Chinook returning to state hatcheries
- Project: 1995-063-35, Contract: 56662 REL 82, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 82, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 1998-019-00, Contract: 69900, Work Statement Element: Work Element F: 157 - Collect adult abundance data via mark-resight
- Project: 2008-710-00, Contract: 67595, Work Statement Element: Work Element AP: 157 - FFY16 Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 1996-035-01, Contract: 56662 REL 99, Work Statement Element: Work Element K: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 1995-063-35, Contract: 56662 REL 106, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 106, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 2010-036-00, Contract: 72970, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 72970, Work Statement Element: Work Element E: 157 - Chinook Spawning Ground Surveys
- Project: 1998-019-00, Contract: 73756, Work Statement Element: Work Element F: 157 - Collect adult abundance data via mark-resight
- Project: 2008-710-00, Contract: 73502, Work Statement Element: Work Element D: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 73502, Work Statement Element: Work Element E: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 73502, Work Statement Element: Work Element H: 157 - Adult trap monitoring at Duncan Creek
- Project: 2010-028-00, Contract: 74615, Work Statement Element: Work Element I: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 2010-050-00, Contract: 74314 REL 12, Work Statement Element: Work Element M: 157 - WDFW Steelhead Spawning Surveys in the upper Tucannon River
- Project: 1998-019-00, Contract: 74314 REL 15, Work Statement Element: Work Element B: 157 - Collect Adult Abundance Data Via Mark-Resight
- Project: 1996-035-01, Contract: 56662 REL 127, Work Statement Element: Work Element K: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 1995-063-35, Contract: 56662 REL 134, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 134, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 2008-710-00, Contract: 74314 REL 14, Work Statement Element: Work Element B: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging (PSMFC)
- Project: 2008-710-00, Contract: 74314 REL 14, Work Statement Element: Work Element C: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 74314 REL 14, Work Statement Element: Work Element D: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 74314 REL 14, Work Statement Element: Work Element G: 157 - Adult trap monitoring at Duncan Creek
- Project: 2010-050-00, Contract: 74314 REL 45, Work Statement Element: Work Element M: 157 - WDFW Steelhead Spawning Surveys in the upper Tucannon River
- Project: 2010-028-00, Contract: 74314 REL 23, Work Statement Element: Work Element I: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 1996-035-01, Contract: 56662 REL 166, Work Statement Element: Work Element F: 157 - Conduct Steelhead Spawning Surveys in Toppenish Creek
- Project: 1996-035-01, Contract: 56662 REL 152, Work Statement Element: Work Element K: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 1995-063-35, Contract: 56662 REL 162, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 162, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 1998-019-00, Contract: 74314 REL 50, Work Statement Element: Work Element B: 157 - Collect Adult Abundance Data Via Mark-Resight
- Project: 2008-710-00, Contract: 74314 REL 49, Work Statement Element: Work Element B: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging (PSMFC)
- Project: 2008-710-00, Contract: 74314 REL 49, Work Statement Element: Work Element C: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 74314 REL 49, Work Statement Element: Work Element D: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 74314 REL 49, Work Statement Element: Work Element G: 157 - Adult trap monitoring at Duncan Creek
- Project: 1996-035-01, Contract: 56662 REL 166, Work Statement Element: Work Element G: 157 - Operate Portable Instream PIT Arrays in Toppenish Creek
- Project: 2010-028-00, Contract: 74314 REL 56, Work Statement Element: Work Element I: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 2010-050-00, Contract: 74314 REL 73, Work Statement Element: Work Element L: 157 - WDFW Steelhead Spawning Surveys in the upper Tucannon River
- Project: 1996-035-01, Contract: 56662 REL 192, Work Statement Element: Work Element F: 157 - Conduct Steelhead Spawning Surveys in Toppenish Creek
- Project: 1996-035-01, Contract: 56662 REL 178, Work Statement Element: Work Element K: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 1995-063-35, Contract: 56662 REL 188, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 188, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 2008-710-00, Contract: 74314 REL 86, Work Statement Element: Work Element C: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging
- Project: 2008-710-00, Contract: 74314 REL 86, Work Statement Element: Work Element E: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 74314 REL 86, Work Statement Element: Work Element G: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 74314 REL 86, Work Statement Element: Work Element J: 157 - Adult trap monitoring at Duncan Creek
- Project: 1998-019-00, Contract: 74314 REL 82, Work Statement Element: Work Element C: 157 - Collect Adult Abundance Data Via Mark-Resight
- Project: 2010-028-00, Contract: 74314 REL 89, Work Statement Element: Work Element I: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 1996-035-01, Contract: 56662 REL 212, Work Statement Element: Work Element K: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 1995-063-35, Contract: 56662 REL 213, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 213, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 2008-710-00, Contract: 74314 REL 112, Work Statement Element: Work Element C: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging
- Project: 2008-710-00, Contract: 74314 REL 112, Work Statement Element: Work Element E: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 74314 REL 112, Work Statement Element: Work Element G: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 74314 REL 112, Work Statement Element: Work Element J: 157 - Adult trap monitoring at Duncan Creek
- Project: 2010-050-00, Contract: 74314 REL 107, Work Statement Element: Work Element L: 157 - WDFW Steelhead Spawning Surveys in the upper Tucannon River
- Project: 1996-035-01, Contract: 56662 REL 217, Work Statement Element: Work Element E: 157 - Conduct Steelhead Spawning Surveys in Toppenish Creek
- Project: 1998-019-00, Contract: 74314 REL 117, Work Statement Element: Work Element C: 157 - Collect Adult Abundance Data Via Mark-Resight
- Project: 2010-028-00, Contract: 74314 REL 121, Work Statement Element: Work Element H: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 1996-035-01, Contract: 56662 REL 234, Work Statement Element: Work Element L: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 1996-035-01, Contract: 56662 REL 242, Work Statement Element: Work Element E: 157 - Conduct Steelhead Spawning Surveys in Toppenish Creek
- Project: 1995-063-35, Contract: 56662 REL 239, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 239, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 1998-019-00, Contract: 74314 REL 147, Work Statement Element: Work Element C: 157 - Collect Adult Abundance Data Via Mark-Resight
- Project: 2010-050-00, Contract: 74314 REL 133, Work Statement Element: Work Element L: 157 - WDFW Steelhead Spawning Surveys in the upper Tucannon River
- Project: 2008-710-00, Contract: 74314 REL 143, Work Statement Element: Work Element F: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 74314 REL 143, Work Statement Element: Work Element H: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 74314 REL 143, Work Statement Element: Work Element K: 157 - Adult trap monitoring at Duncan Creek
- Project: 1996-035-01, Contract: 56662 REL 266, Work Statement Element: Work Element E: 157 - Conduct Steelhead Spawning Surveys in Toppenish Creek
- Project: 2010-028-00, Contract: CR-347810, Work Statement Element: Work Element H: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 2002-053-00, Contract: 74314 REL 153, Work Statement Element: Work Element O: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 1996-035-01, Contract: 56662 REL 256, Work Statement Element: Work Element K: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 1995-063-35, Contract: 56662 REL 264, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 264, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 2008-710-00, Contract: 84042 REL 8, Work Statement Element: Work Element F: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 84042 REL 8, Work Statement Element: Work Element H: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 84042 REL 8, Work Statement Element: Work Element K: 157 - Adult trap monitoring at Duncan Creek
- Project: 1998-019-00, Contract: 84042 REL 17, Work Statement Element: Work Element D: 157 - Collect Adult Abundance Data Via Mark-Resight
- Project: 2002-053-00, Contract: 84042 REL 23, Work Statement Element: Work Element O: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 1996-035-01, Contract: 56662 REL 283, Work Statement Element: Work Element K: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 2008-710-00, Contract: 84042 REL 42, Work Statement Element: Work Element D: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging
- Project: 2008-710-00, Contract: 84042 REL 42, Work Statement Element: Work Element F: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 84042 REL 42, Work Statement Element: Work Element H: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 84042 REL 42, Work Statement Element: Work Element K: 157 - Adult trap monitoring at Duncan Creek
- Project: 2010-036-00, Contract: 78040 REL 59, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 59, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 84042 REL 45, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 84042 REL 45, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 1995-063-35, Contract: 56662 REL 288, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 288, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 1996-035-01, Contract: 56662 REL 292, Work Statement Element: Work Element E: 157 - Conduct Steelhead Spawning Surveys in Toppenish Creek
- Project: 1995-063-35, Contract: 56662 REL 288, Work Statement Element: Work Element T: 162 - Spring Chinook Run Reconstruction/Forecast and other Data Analysis
- Project: 1998-019-00, Contract: 84042 REL 50, Work Statement Element: Work Element D: 157 - Collect Adult Abundance Data Via Mark-Resight
- Project: 2002-053-00, Contract: 84042 REL 56, Work Statement Element: Work Element O: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 1996-035-01, Contract: 56662 REL 315, Work Statement Element: Work Element E: 157 - Conduct Steelhead Spawning Surveys in Toppenish Creek
- Project: 1998-019-00, Contract: 84042 REL 83, Work Statement Element: Work Element D: 157 - Collect Adult Abundance Data Via Mark-Resight
- Project: 1995-063-35, Contract: 56662 REL 312, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 56662 REL 312, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 1995-063-35, Contract: 56662 REL 312, Work Statement Element: Work Element T: 162 - Spring Chinook Run Reconstruction/Forecast and other Data Analysis
- Project: 1996-035-01, Contract: 94526, Work Statement Element: Work Element I: 157 - Conduct steelhead and bull trout spawner surveys
- Project: 2008-710-00, Contract: 84042 REL 77, Work Statement Element: Work Element C: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging
- Project: 2008-710-00, Contract: 84042 REL 77, Work Statement Element: Work Element E: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 84042 REL 77, Work Statement Element: Work Element G: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 84042 REL 77, Work Statement Element: Work Element J: 157 - Adult trap monitoring at Duncan Creek
- Project: 1999-003-01, Contract: 78040 REL 70, Work Statement Element: Work Element C: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2010-036-00, Contract: 84042 REL 76, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 84042 REL 76, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 69, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 69, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2002-053-00, Contract: 84042 REL 90, Work Statement Element: Work Element M: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 1999-003-01, Contract: 78040 REL 80, Work Statement Element: Work Element C: 157 - Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2008-710-00, Contract: 84042 REL 114, Work Statement Element: Work Element C: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging
- Project: 2008-710-00, Contract: 84042 REL 114, Work Statement Element: Work Element E: 157 - Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: 84042 REL 114, Work Statement Element: Work Element G: 157 - Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: 84042 REL 114, Work Statement Element: Work Element J: 157 - Adult trap monitoring at Duncan Creek
- Project: 2010-036-00, Contract: 78040 REL 79, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 78040 REL 79, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: 84042 REL 112, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: 84042 REL 112, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 1995-063-35, Contract: 96832, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: 96832, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 1995-063-35, Contract: 96832, Work Statement Element: Work Element T: 162 - Spring Chinook Run Reconstruction/Forecast and other Data Analysis
- Project: 1996-035-01, Contract: 96938, Work Statement Element: Work Element E: 157 - Conduct Steelhead Spawning Surveys in Toppenish Creek
- Project: 1998-019-00, Contract: 84042 REL 116, Work Statement Element: Work Element E: 157 - Collect Adult Abundance Data Via Mark-Resight
- Project: 2002-053-00, Contract: 84042 REL 120, Work Statement Element: Work Element M: 157 - WDFW Steelhead Spawning Surveys in Asotin and Tucannon Tributaries
- Project: 1999-003-01, Contract: CR-379665, Work Statement Element: Work Element C: 157 - COPY: Chinook Salmon Spawning Ground Surveys in the mainstem
- Project: 2008-710-00, Contract: CR-379668, Work Statement Element: Work Element C: 157 - COPY: Spawning ground surveys & sampling/marking for spawner population estimates via carcass tagging
- Project: 2008-710-00, Contract: CR-379668, Work Statement Element: Work Element E: 157 - COPY: Spawning ground surveys & sampling/marking for spawner population estimates via live tagging
- Project: 2008-710-00, Contract: CR-379668, Work Statement Element: Work Element G: 157 - COPY: Spawning ground surveys & sampling in areas with low chum salmon spawner abundance
- Project: 2008-710-00, Contract: CR-379668, Work Statement Element: Work Element J: 157 - COPY: Adult trap monitoring at Duncan Creek
- Project: 2010-036-00, Contract: CR-380916, Work Statement Element: Work Element D: 157 - COPY: Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: CR-380916, Work Statement Element: Work Element E: 157 - COPY: Spring and Fall Chinook Spawning Ground Surveys
- Project: 2010-036-00, Contract: CR-380917, Work Statement Element: Work Element D: 157 - Coho Spawning Ground Surveys
- Project: 2010-036-00, Contract: CR-380917, Work Statement Element: Work Element E: 157 - Spring and Fall Chinook Spawning Ground Surveys
- Project: 1996-035-01, Contract: CR-381639, Work Statement Element: Work Element E: 157 - Conduct Steelhead Spawning Surveys in Toppenish Creek
- Project: 1995-063-35, Contract: CR-381757, Work Statement Element: Work Element D: 157 - Spawning ground surveys (redd counts)
- Project: 1995-063-35, Contract: CR-381757, Work Statement Element: Work Element E: 157 - Adult salmonid monitoring
- Project: 1995-063-35, Contract: CR-381757, Work Statement Element: Work Element T: 162 - Spring Chinook Run Reconstruction/Forecast and other Data Analysis
- Project: 1998-019-00, Contract: CR-383002, Work Statement Element: Work Element E: 157 - Collect Adult Abundance Data Via Mark-Resight
- Proposal: NPCC19-1999-003-01, Project: 1999-003-01
- Proposal: NPCC19-2010-036-00, Project: 2010-036-00