Repository: Lower Granite Dam Adult Trap Database
- ID: 1200
- Created by: Rebecca Scully
- Created: 8/25/2016 2:50 PM
- Updated by: Rebecca Scully
- Updated: 11/10/2016 10:58 AM
Lower Granite Dam Adult Trap Database
Independent
<none>
http://lgradulttrap.rtdatacloud.com/#/Data
<none>
<none>
Administrators
- Darren Ogden (Darren.Ogden@noaa.gov)
Organizations
Identifier
7801ebf3-92f9-4239-9030-06ca183916b0
The following items are associated with this Environmental Information Repository.
Who’s Using this Repository?
Sample Designs
- Lower Granite Dam adult steelhead and Chinook salmon scale ageing (Priorities 4.3 - 4.4) - Quantitative Consultants Inc 1
- Assign ages to adult and juvenile steelhead scale samples collected at trap & weirs in 2011 - Idaho Department of Fish and Game (IDFG)
- Sample wild steelhead adults at Lower Granite Dam - Idaho Department of Fish and Game (IDFG)
- IDFG juvenile wild Chinook Salmon sampling at Lower Granite Dam - Idaho Department of Fish and Game (IDFG)
- IDFG adult wild Chinook Salmon sampling at Lower Granite Dam - Idaho Department of Fish and Game (IDFG)
- Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook - National Oceanic and Atmospheric Administration
- IDFG juvenile spring/summer Chinook Salmon and steelhead sampling at Lower Granite Dam - Idaho Department of Fish and Game (IDFG)
- Adult Age Composition of wild Chinook Salmon and steelhead from scales and fin rays collected from Lower Granite Dam, temporary weirs, hatchery traps, and post-spawn carcasses. Idaho Department of Fish and Game (IDFG)
- PIT tag Based Steelhead Escapement Estimation Above Lower Granite Dam DABOM
- PIT tag Based Sp/Su Chinook Salmon Escapement Estimation Above Lower Granite Dam DABOM
- Sample wild steelhead adults at Lower Granite Dam - Idaho Department of Fish and Game (IDFG), cloned for Study Plan 469
- Lower Granite Dam Sampling for Idaho Wild Adult Steelhead and Chinook Salmon: 2021 Version v2.0
- Project: 1991-073-00, Contract: 75491, Work Statement Element: Work Element H: 157 - IDFG adult wild Chinook Salmon sampling at Lower Granite Dam
- Project: 1991-073-00, Contract: 75491, Work Statement Element: Work Element G: 157 - IDFG juvenile wild Chinook Salmon sampling at Lower Granite Dam
- Project: 2003-017-00, Contract: 74633, Work Statement Element: Work Element O: 162 - Lower Granite Dam adult steelhead and Chinook salmon scale ageing (Priorities 4.3 - 4.4)
- Project: 2003-017-00, Contract: 74633, Work Statement Element: Work Element P: 160 - Manage ISEMP database
- Project: 1990-055-00, Contract: 74851, Work Statement Element: Work Element I: 157 - IDFG juvenile wild steelhead sampling at Lower Granite Dam
- Project: 1990-055-00, Contract: 74851, Work Statement Element: Work Element J: 157 - IDFG adult wild steelhead sampling at Lower Granite Dam
- Project: 2003-017-00, Contract: 77840, Work Statement Element: Work Element M: 160 - Manage ISEMP database
- Project: 1991-073-00, Contract: 78413, Work Statement Element: Work Element G: 157 - IDFG juvenile wild Chinook Salmon sampling at Lower Granite Dam
- Project: 1991-073-00, Contract: 78413, Work Statement Element: Work Element H: 157 - IDFG adult wild Chinook Salmon sampling at Lower Granite Dam
- Project: 1990-055-00, Contract: 78368, Work Statement Element: Work Element I: 157 - IDFG juvenile wild steelhead sampling at Lower Granite Dam
- Project: 1990-055-00, Contract: 78368, Work Statement Element: Work Element J: 157 - IDFG adult wild steelhead sampling at Lower Granite Dam
- Project: 1990-055-00, Contract: 81177, Work Statement Element: Work Element I: 157 - IDFG juvenile wild steelhead sampling at Lower Granite Dam
- Project: 1990-055-00, Contract: 81177, Work Statement Element: Work Element J: 157 - IDFG adult wild steelhead sampling at Lower Granite Dam
- Project: 1991-073-00, Contract: 81352, Work Statement Element: Work Element H: 157 - IDFG adult wild Chinook Salmon sampling at Lower Granite Dam
- Project: 1991-073-00, Contract: 81352, Work Statement Element: Work Element G: 157 - IDFG juvenile wild Chinook Salmon sampling at Lower Granite Dam
- Project: 1990-055-00, Contract: 84169, Work Statement Element: Work Element K: 157 - IDFG LOWER GRANITE DAM ADULT SAMPLING for wild spring/summer Chinook Salmon and steelhead
- Project: 2005-002-00, Contract: 83639 REL 6, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 84169, Work Statement Element: Work Element L: 162 - IDFG ADULT AGE COMPOSITION of wild Chinook Salmon and steelhead from scales and fin rays collected from Lower Granite Dam, temporary weirs, hatchery traps, and post-spawn carcasses.
- Project: 2010-057-00, Contract: 74017 REL 62, Work Statement Element: Work Element U: 159 - Summarize, Transfer, and Disiminate Tributary and/or Site Specific IPTDS Escapement Estimates and Data for Snake Basin Steelhead and Spring/Summer Chinook Salmon to Regional Databases and to Co-managers.
- Project: 2010-057-00, Contract: 74017 REL 62, Work Statement Element: Work Element V: 159 - Fulfill Data and Assessment Summaries requested by NPT Fisheries Management, Regional Co-managers
- Project: 1990-055-00, Contract: 86806, Work Statement Element: Work Element K: 162 - IDFG ADULT AGE COMPOSITION of wild Chinook Salmon and steelhead from scales and fin rays collected from Lower Granite Dam, temporary weirs, hatchery traps, and post-spawn carcasses.
- Project: 2010-057-00, Contract: 74017 REL 73, Work Statement Element: Work Element R: 162 - Snake Basin IPTDS Steelhead Abundance, Life History and Productivity Data Analysis
- Project: 2010-057-00, Contract: 74017 REL 73, Work Statement Element: Work Element S: 162 - Snake Basin IPTDS Spring/summer Chinook Salmon Abundance, Life History and Productivity Data Analysis
- Project: 2010-057-00, Contract: 74017 REL 73, Work Statement Element: Work Element U: 159 - Fulfill Data and Assessment Summaries requested by NPT Fisheries Management, Regional Co-managers
- Project: 2005-002-00, Contract: 83639 REL 18, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 86806, Work Statement Element: Work Element J: 157 - IDFG LOWER GRANITE DAM ADULT SAMPLING for wild spring/summer Chinook Salmon and steelhead
- Project: 2005-002-00, Contract: 83639 REL 31, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 89381, Work Statement Element: Work Element I: 157 - IDFG Lower Granite Dam Adult Sampling for wild spring/summer Chinook Salmon and Steelhead
- Project: 1990-055-00, Contract: 89381, Work Statement Element: Work Element J: 162 - IDFG Population Performance Metrics of Wild Adult Chinook Salmon and Steelhead from Lower Granite Dam Sampling
- Project: 2010-057-00, Contract: 74017 REL 90, Work Statement Element: Work Element R: 162 - Snake Basin IPTDS Steelhead Abundance, Life History and Productivity Data Analysis
- Project: 2010-057-00, Contract: 74017 REL 90, Work Statement Element: Work Element S: 162 - Snake Basin IPTDS Spring/summer Chinook Salmon Abundance, Life History and Productivity Data Analysis
- Project: 2010-057-00, Contract: 74017 REL 90, Work Statement Element: Work Element U: 159 - Fulfill Data and Assessment Summaries requested by NPT Fisheries Management, Regional Co-managers
- Project: 1990-055-00, Contract: 84045 REL 6, Work Statement Element: Work Element I: 157 - IDFG Lower Granite Dam Adult Sampling for wild spring/summer Chinook Salmon and Steelhead
- Project: 1990-055-00, Contract: 84045 REL 6, Work Statement Element: Work Element J: 162 - IDFG Population Performance Metrics of Wild Adult Chinook Salmon and Steelhead from Lower Granite Dam Sampling
- Project: 2010-057-00, Contract: 84044 REL 8, Work Statement Element: Work Element U: 162 - Snake Basin IPTDS Steelhead Abundance, Life History and Productivity Data Analysis
- Project: 2010-057-00, Contract: 84044 REL 8, Work Statement Element: Work Element V: 162 - Snake Basin IPTDS Spring/summer Chinook Salmon Abundance, Life History and Productivity Data Analysis
- Project: 2010-057-00, Contract: 84044 REL 8, Work Statement Element: Work Element P: 159 - Fulfill Data and Assessment Summaries requested by NPT Fisheries Management, Regional Co-managers
- Project: 2005-002-00, Contract: 83639 REL 43, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 2005-002-00, Contract: 23246, Work Statement Element: Work Element C: 157 - Sample Steelhead and PIT-Tagged Fall Chinook
- Project: 2005-002-00, Contract: 24333, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 2005-002-00, Contract: 29545, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 2005-002-00, Contract: 35039, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 2005-002-00, Contract: 39013, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 36150, Work Statement Element: Work Element AC: 157 - **Sample adult steelhead at Lower Granite Dam
- Project: 1990-055-00, Contract: 40650, Work Statement Element: Work Element O: 157 - Sample adult steelhead at Lower Granite Dam
- Project: 2005-002-00, Contract: 44314, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 45642, Work Statement Element: Work Element O: 157 - Sample adult steelhead at Lower Granite Dam
- Project: 1990-055-00, Contract: 45642, Work Statement Element: Work Element AD: 157 - Sample wild steelhead smolts at Lower Granite Dam - NEW
- Project: 1990-055-00, Contract: 50973, Work Statement Element: Work Element J: 157 - Sample adult steelhead at Lower Granite Dam
- Project: 1990-055-00, Contract: 50973, Work Statement Element: Work Element K: 157 - Sample wild steelhead smolts at Lower Granite Dam
- Project: 2005-002-00, Contract: 46273 REL 16, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 2005-002-00, Contract: 46273 REL 33, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 55728, Work Statement Element: Work Element J: 157 - Sample adult steelhead at Lower Granite Dam
- Project: 1990-055-00, Contract: 55728, Work Statement Element: Work Element K: 157 - Sample wild steelhead smolts at Lower Granite Dam
- Project: 1990-055-00, Contract: 55728, Work Statement Element: Work Element L: 162 - Assign ages to adult and juvenile steelhead scale samples collected at trap & weirs in 2011
- Project: 1990-055-00, Contract: 55728, Work Statement Element: Work Element U: 162 - Estimate 2011 steelhead escapement in Fish Creek, Rapid River & Big Creek
- Project: 1990-055-00, Contract: 55728, Work Statement Element: Work Element AA: 157 - Collect Data for Annual Steelhead Run Reconstruction with Co-Managers*
- Project: 2005-002-00, Contract: 46273 REL 50, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 59800, Work Statement Element: Work Element J: 157 - Sample adult steelhead at Lower Granite Dam
- Project: 1990-055-00, Contract: 59800, Work Statement Element: Work Element K: 157 - Sample wild steelhead smolts at Lower Granite Dam
- Project: 1990-055-00, Contract: 59800, Work Statement Element: Work Element L: 162 - Assign ages to adult and juvenile steelhead scale samples collected at trap & weirs in 2012
- Project: 1990-055-00, Contract: 59800, Work Statement Element: Work Element U: 162 - Estimate 2012 steelhead escapement in Fish Creek, Rapid River & Big Creek
- Project: 1990-055-00, Contract: 59800, Work Statement Element: Work Element AA: 157 - Collect Data for Annual Steelhead Run Reconstruction with Co-Managers
- Project: 1990-055-00, Contract: 63755, Work Statement Element: Work Element J: 157 - Sample adult steelhead at Lower Granite Dam
- Project: 1990-055-00, Contract: 63755, Work Statement Element: Work Element K: 157 - Sample wild steelhead smolts at Lower Granite Dam
- Project: 1990-055-00, Contract: 63755, Work Statement Element: Work Element L: 162 - Assign ages to adult and juvenile steelhead scale samples collected at trap & weirs in 2013
- Project: 1990-055-00, Contract: 63755, Work Statement Element: Work Element U: 162 - Estimate 2012 steelhead escapement in Fish Creek, Rapid River & Big Creek
- Project: 1990-055-00, Contract: 63755, Work Statement Element: Work Element AA: 157 - Collect Data for Annual Steelhead Run Reconstruction with Co-Managers
- Project: 2005-002-00, Contract: 46273 REL 70, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 2005-002-00, Contract: CR-262756, Work Statement Element: Work Element C: 157 - COPY: Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 2005-002-00, Contract: 46273 REL 91, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 67655, Work Statement Element: Work Element I: 157 - Sample Wild Adult and Juvenile Steelhead at Lower Granite Dam*
- Project: 1990-055-00, Contract: 67655, Work Statement Element: Work Element S: 157 - Collate Data for Annual Steelhead Run Reconstruction with Co-Managers (2013-2014 data)
- Project: 2005-002-00, Contract: 46273 REL 109, Work Statement Element: Work Element C: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 71170, Work Statement Element: Work Element I: 157 - Sample Wild Adult and Juvenile Steelhead at Lower Granite Dam
- Project: 1990-055-00, Contract: 71170, Work Statement Element: Work Element L: 162 - Assign Ages to Steelhead Scales Collected at Lower Granite Dam, Traps, and Weirs
- Project: 1990-055-00, Contract: 71170, Work Statement Element: Work Element R: 157 - Collate Data for Annual Steelhead Run Reconstruction with Co-Managers (2014-2015 data)
- Project: 2005-002-00, Contract: 46273 REL 124, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 74851, Work Statement Element: Work Element S: 162 - Wild adult steelhead age composition from scales collected at LGR, & IDFG weirs & hatchery traps
- Project: 2005-002-00, Contract: 46273 REL 140, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 78368, Work Statement Element: Work Element S: 162 - Wild adult steelhead age composition from scales collected at LGR, & IDFG weirs & hatchery traps
- Project: 1990-055-00, Contract: 81177, Work Statement Element: Work Element S: 162 - Wild adult steelhead age composition from scales collected at LGR, & IDFG weirs & hatchery traps
- Project: 2005-002-00, Contract: 46273 REL 158, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 84169, Work Statement Element: Work Element H: 157 - IDFG LOWER GRANITE DAM JUVENILE SAMPLING for wild Chinook Salmon and steelhead
- Project: 1990-055-00, Contract: 86806, Work Statement Element: Work Element G: 157 - IDFG LOWER GRANITE DAM JUVENILE SAMPLING for wild Chinook Salmon and steelhead
- Project: 2010-031-00, Contract: 88216, Work Statement Element: Work Element V: 157 - OBJ 4. Lower Granite Dam wild and hatchery stock monitoring
- Project: 2010-031-00, Contract: 88216, Work Statement Element: Work Element AB: 157 - OBJ 5. Steelhead stock composition in the Columbia and Snake River Tribal and Sport Fisheries
- Project: 1990-055-00, Contract: 89381, Work Statement Element: Work Element G: 157 - IDFG Lower Granite Dam Juvenile Sampling for wild Chinook Salmon and steelhead
- Project: 1990-055-00, Contract: 89381, Work Statement Element: Work Element H: 162 - IDFG Juvenile Age Composition of wild Chinook Salmon and steelhead from scales collected at Lower Granite Dam
- Project: 2010-031-00, Contract: 90544, Work Statement Element: Work Element V: 157 - OBJ 4. Lower Granite Dam wild and hatchery stock monitoring
- Project: 2010-031-00, Contract: 90544, Work Statement Element: Work Element AB: 157 - OBJ 5. Steelhead stock composition in the Columbia and Snake River Tribal and Sport Fisheries
- Project: 1990-055-00, Contract: 84045 REL 6, Work Statement Element: Work Element G: 157 - IDFG Lower Granite Dam Juvenile Sampling for wild Chinook salmon and steelhead
- Project: 1990-055-00, Contract: 84045 REL 6, Work Statement Element: Work Element H: 162 - IDFG Juvenile Age Composition of wild Chinook Salmon and steelhead from scales collected at Lower Granite Dam
- Project: 2010-031-00, Contract: 84045 REL 14, Work Statement Element: Work Element V: 157 - OBJ 4. Lower Granite Dam wild and hatchery stock monitoring
- Project: 2010-031-00, Contract: 84045 REL 14, Work Statement Element: Work Element AB: 157 - OBJ 5. Steelhead stock composition in the Columbia and Snake River Tribal and Sport Fisheries
- Project: 2010-057-00, Contract: 84044 REL 35, Work Statement Element: Work Element U: 162 - Snake Basin IPTDS Steelhead Abundance, Life History and Productivity Data Analysis
- Project: 2010-057-00, Contract: 84044 REL 35, Work Statement Element: Work Element V: 162 - Snake Basin IPTDS Spring/summer Chinook Salmon Abundance, Life History and Productivity Data Analysis
- Project: 2010-057-00, Contract: 84044 REL 35, Work Statement Element: Work Element P: 159 - Fulfill Data and Assessment Summaries requested by NPT Fisheries Management, Regional Co-managers
- Project: 1990-055-00, Contract: 84045 REL 21, Work Statement Element: Work Element F: 157 - IDFG Lower Granite Dam Juvenile Sampling for wild Chinook salmon and steelhead
- Project: 1990-055-00, Contract: 84045 REL 21, Work Statement Element: Work Element G: 162 - IDFG Juvenile Age Composition of wild Chinook Salmon and steelhead from scales collected at Lower Granite Dam
- Project: 1990-055-00, Contract: 84045 REL 21, Work Statement Element: Work Element H: 157 - IDFG Lower Granite Dam Adult Sampling for wild spring/summer Chinook Salmon and Steelhead
- Project: 1990-055-00, Contract: 84045 REL 21, Work Statement Element: Work Element I: 162 - IDFG Population Performance Metrics of Wild Adult Chinook Salmon and Steelhead from Lower Granite Dam Sampling
- Project: 2005-002-00, Contract: 83639 REL 55, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 2010-031-00, Contract: 84045 REL 30, Work Statement Element: Work Element V: 157 - OBJ 4. Lower Granite Dam wild and hatchery stock monitoring
- Project: 2010-031-00, Contract: 84045 REL 30, Work Statement Element: Work Element AA: 157 - OBJ 5. Steelhead stock composition in the Columbia and Snake River Tribal and Sport Fisheries
- Project: 1990-055-00, Contract: 84045 REL 34, Work Statement Element: Work Element G: 157 - IDFG Lower Granite Dam Juvenile Sampling for wild Chinook salmon and steelhead
- Project: 1990-055-00, Contract: 84045 REL 34, Work Statement Element: Work Element H: 162 - IDFG Juvenile Age Composition of wild steelhead from scales collected at Lower Granite Dam
- Project: 1990-055-00, Contract: 84045 REL 34, Work Statement Element: Work Element I: 157 - IDFG Lower Granite Dam Adult Sampling for wild spring/summer Chinook Salmon and Steelhead
- Project: 1990-055-00, Contract: 84045 REL 34, Work Statement Element: Work Element J: 162 - IDFG Population Performance Metrics of Wild Adult Chinook Salmon and Steelhead from Lower Granite Dam Sampling
- Project: 2005-002-00, Contract: 83639 REL 66, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 2010-031-00, Contract: 84045 REL 40, Work Statement Element: Work Element V: 157 - OBJ 4. Lower Granite Dam wild and hatchery stock monitoring
- Project: 2010-031-00, Contract: 84045 REL 40, Work Statement Element: Work Element AA: 157 - OBJ 5. Steelhead stock composition in the Columbia and Snake River Tribal and Sport Fisheries
- Project: 2005-002-00, Contract: 96968, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 84045 REL 49, Work Statement Element: Work Element J: 157 - IDFG Lower Granite Dam Juvenile Sampling for wild Chinook salmon and steelhead
- Project: 1990-055-00, Contract: 84045 REL 49, Work Statement Element: Work Element K: 162 - IDFG Juvenile Age Composition of wild steelhead from scales collected at Lower Granite Dam
- Project: 1990-055-00, Contract: 84045 REL 49, Work Statement Element: Work Element L: 157 - IDFG Lower Granite Dam Adult Sampling for wild spring/summer Chinook Salmon and Steelhead
- Project: 1990-055-00, Contract: 84045 REL 49, Work Statement Element: Work Element M: 162 - IDFG Population Performance Metrics of Wild Adult Chinook Salmon and Steelhead from Lower Granite Dam Sampling
- Project: 2010-031-00, Contract: CR-379671, Work Statement Element: Work Element V: 157 - OBJ 4. Lower Granite Dam wild and hatchery stock monitoring
- Project: 2010-031-00, Contract: CR-379671, Work Statement Element: Work Element AA: 157 - OBJ 5. Steelhead stock composition in the Columbia and Snake River Tribal and Sport Fisheries
- Project: 2005-002-00, Contract: 83639 REL 76, Work Statement Element: Work Element D: 157 - Sample Steelhead, spring/summer Chinook, and PIT-Tagged Fall Chinook
- Project: 1990-055-00, Contract: 84045 REL 49, Work Statement Element: Work Element AG: 157 - IDFG Lower Granite Dam Juvenile Sampling for wild Chinook salmon and steelhead
- Project: 1990-055-00, Contract: 84045 REL 49, Work Statement Element: Work Element AH: 162 - IDFG Juvenile Age Composition of wild steelhead from scales collected at Lower Granite Dam
- Project: 1990-055-00, Contract: 84045 REL 49, Work Statement Element: Work Element AI: 157 - IDFG Lower Granite Dam Adult Sampling for wild spring/summer Chinook Salmon and Steelhead
- Project: 1990-055-00, Contract: 84045 REL 49, Work Statement Element: Work Element AJ: 162 - IDFG Population Performance Metrics of Wild Adult Chinook Salmon and Steelhead from Lower Granite Dam Sampling
- Proposal: NPCC19-2005-002-00, Project: 2005-002-00