Nez Perce Tribe DFRM Watershed Division website
Independent
The Nez Perce Tribe Department of Fisheries Resource Management Watershed Division is focused on protecting, restoring, and enhancing watersheds and all treaty resources throughout Nez Perce Territory.
http://www.nptfisheries.org/Watershed.aspx
<none>
<none>
Administrators
<none>
Organizations
Identifier
a5ba2092-2b70-41eb-832e-311bb394f922
The following items are associated with this Environmental Information Repository.
Who’s Using this Repository?
Sample Designs
- Partial Barrier AEM MBACI data collection - Nez Perce Tribe
- Bank Stabilization AEM MBACI data collection - Nez Perce Tribe
- Floodplain/Channel Restoration AEM MBACI data collection - Nez Perce Tribe
- Removed Roads Data Collection - Nez Perce Tribe: Newsome Creek Watershed Restoration
- Stream Habitat Data Collection - Nez Perce Tribe: Newsome Creek Watershed Restoration
- Condition/Health of Newsome Creek - Nez Perce Tribe 1
- Decommissioned/Improved Roads Data Collection - Nez Perce Tribe: Red River and Newsome Creek
- Culvert and Bridge Replacement/Removal Data Collection - Nez Perce Tribe 1
- Stream Habitat Data Collection - Nez Perce Tribe: Red River/Newsome Creek Watershed Restoration
- Collect Data on Culverts and Bridges that have been Replaced - Nez Perce Tribe: Newsome Creek
- Condition/Health of Red River - Nez Perce Tribe 1
- Stream Habitat and Metals Monitoring Data Collection - Nez Perce Tribe 1
- Culvert/Bridge Replacement and Removal Data Collection - Nez Perce Tribe: Crooked and American Rivers
- 3135 & 3136 Culvert on FS Road 221 Data Collection - Nez Perce Tribe 1
- 3136 Culvert on FS Road 221 Data Collection - Nez Perce Tribe 1
- Collect Implementation Monitoring Data on Culvert Replacements - Nez Perce Tribe
- Analysis of Road, Weed and Culvert Data - Nez Perce Tribe 1
- Culvert/Bridge Replacement and Removal Data Collection - Nez Perce Tribe: Lolo Creek and Selway River
- Collect Baseline Data on Roads to be Removed, and Monitor Already Removed Roads - Nez Perce Tribe: Lochsa
- Decommissioned/Improved Roads Data Collection - Nez Perce Tribe: Lolo Creek and Selway River
- Effectiveness Monitoring Data for Road Decommissioning and Stream Crossing AOP Projects - Nez Perce Tribe
- Collect Monitoring Data for Weed Treatment - Nez Perce Tribe: Lochsa Watershed
- Stream Habitat Data Collection - Nez Perce Tribe: Lolo/Selway River Watershed Restoration
- Lolo Creek Data Analysis - Nez Perce Tribe 1
- Analyze Scale Samples - Nez Perce Tribe 1
- Data Entry - Nez Perce Tribe 1
- Analyze survey data - Nez Perce Tribe 1
- Nez Perce Tribe Adult Abundance and Life History Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Pops - Nez Perce Tribe 1
- Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River - Nez Perce Tribe 1
- Nez Perce Tribe Adult Abundance and Life History Data Analysis - Spring Chinook, Lolo & Newsome Cr. - Nez Perce Tribe 1
- Nez Perce Tribe Adult Weir Data Collection: Steelhead, Joseph Creek - Nez Perce Tribe 1
- Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead - Nez Perce Tribe 1
- Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Fall Chinook Clearwater R. - Nez Perce Tribe 1
- Nez Perce Tribe Juvenile Abundance & Life History Analysis: EFSFSR and Secesh Sp/Su Chinook - Nez Perce Tribe 1
- COPY: Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive - Nez Perce Tribe
- Nez Perce Tribe Survival and Productivity Data Analysis: Steelhead SFCWR, Newsome Cr., Lolo Cr. - Nez Perce Tribe 1
- Nez Perce Tribe Survival and Productivity Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Pops. - Nez Perce Tribe 1
- Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River - Nez Perce Tribe 1
- Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead - Nez Perce Tribe 1
- Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead - Nez Perce Tribe 1
- Nez Perce Tribe Survival and Productivity Data Analysis: Fall Chinook Snake River Basin - Nez Perce Tribe 1
- Nez Perce Tribe Distribution Data Analysis: Snake River B-Run Steelhead SFCWR - Nez Perce Tribe 1
- Nez Perce Tribe Distribution Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations - Nez Perce Tribe 1
- Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River - Nez Perce Tribe 1
- Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead - Nez Perce Tribe 1
- Nez Perce Tribe Distribution Data Analysis: Fall Chinook Snake River Basin - Nez Perce Tribe 1
- Nez Perce Tribe Habitat Data Analysis: Sp/Su Chinook salmon, Secesh; Steelhead, Joseph - Nez Perce Tribe 1
- Partial Barrier AEM MBACI data collection - Nez Perce Tribe
- Lostine River Rapid Habitat Assessment
- Red River Corrals Assessment
- NPT Lostine/Wallowa Site Assessments - 2019
- NPT Wallowa/SF Clearwater Site Assessments - 2020
- NPT Backpack Electrofishing Surveys - 2020
- NPT Lochsa River eDNA Surveys - 2020
- Partial Barrier AEM MBACI data collection - Nez Perce Tribe
- SF Clearwater Site Assessments - 2021
- NPT Backpack Electrofishing Surveys - 2021
- NPT Lochsa River eDNA Surveys - 2021
- Lostine and SF Clearwater floodplain site assessments - 2022
- NPT Backpack Electrofishing Surveys - 2022
- NPT Lolo Creek and Lochsa River eDNA Surveys - 2022
- SF Clearwater and Little Salmon wood-placement site assessments - 2022
- Lapwai Creek Watershed habitat assessments - 2022
- NPT Backpack Electrofishing Surveys - Lolo Creek 2023
- Lolo Creek Watershed habitat assessments - 2023
- NPT Backpack Electrofishing Surveys - Bear Creek 2024
- NPT Wallowa River watershed habitat assessments - 2024
- NPT Zim's Little Salmon River habitat assessment - 2024
- NPT Watershed Lolo, Wallowa, and Little Salmon habitat assessments - 2024
- NPT Wallowa River and Lolo Creek snorkel surveys - 2024
- NPT Backpack Electrofishing Surveys - South Fork Clearwater River
- NPT Wallowa River and South Fork Clearwater River snorkel surveys
- NPT Wallowa River and South Fork Clearwater River habitat assessments
- Proposal: RMECAT-2007-233-00, Project: 2007-233-00
- Proposal: GEOREV-2000-035-00, Project: 2000-035-00
- Proposal: GEOREV-2010-086-00, Project: 2010-086-00
- Proposal: GEOREV-2002-072-00, Project: 2002-072-00
- Proposal: GEOREV-2007-395-00, Project: 2007-395-00
- Proposal: GEOREV-2007-064-00, Project: 2007-064-00
- Proposal: GEOREV-2007-092-00, Project: 2007-092-00
- Project: 2007-393-00, Contract: 55986, Work Statement Element: Work Element F: 160 - Maintain records of projects
- Project: 2007-233-00, Contract: 58153, Work Statement Element: Work Element B: 157 - Analyze Scale Samples
- Project: 2007-233-00, Contract: 58153, Work Statement Element: Work Element C: 157 - Data Entry
- Project: 2007-233-00, Contract: 58153, Work Statement Element: Work Element D: 162 - Analyze survey data
- Project: 2007-127-00, Contract: 56442, Work Statement Element: Work Element N: 157 - Effectiveness Monitoring Data for Road Decommissioning and Stream Crossing AOP Projects
- Project: 2007-064-00, Contract: 56587, Work Statement Element: Work Element D: 157 - 3135 & 3136 Culvert on FS Road 221 Data Collection
- Project: 2007-064-00, Contract: 60023, Work Statement Element: Work Element D: 157 - 3136 Culvert on FS Road 221 Data Collection
- Project: 2007-393-00, Contract: 59956, Work Statement Element: Work Element F: 160 - Maintain records of projects
- Project: 2007-127-00, Contract: 60876, Work Statement Element: Work Element M: 157 - Effectiveness Monitoring Data for Road Decommissioning and Stream Crossing AOP Projects
- Project: 1996-077-02, Contract: 56024, Work Statement Element: Work Element H: 157 - Culvert/Bridge Replacement and Removal Data Collection
- Project: 1996-077-02, Contract: 56024, Work Statement Element: Work Element I: 157 - Decommissioned/Improved Roads Data Collection
- Project: 1996-077-02, Contract: 56024, Work Statement Element: Work Element J: 157 - Stream Habitat Data Collection
- Project: 1996-077-02, Contract: 56024, Work Statement Element: Work Element K: 162 - Lolo Creek Data Analysis
- Project: 2000-035-00, Contract: 54945, Work Statement Element: Work Element G: 157 - Removed Roads Data Collection
- Project: 2000-035-00, Contract: 54945, Work Statement Element: Work Element H: 157 - Collect Data on Culverts and Bridges that have been Replaced
- Project: 2000-035-00, Contract: 54945, Work Statement Element: Work Element I: 157 - Stream Habitat Data Collection
- Project: 2000-035-00, Contract: 54945, Work Statement Element: Work Element J: 162 - Condition/Health of Newsome Creek
- Project: 2007-395-00, Contract: 55332, Work Statement Element: Work Element K: 157 - Collect Monitoring Data for Weed Treatment
- Project: 2007-395-00, Contract: 55332, Work Statement Element: Work Element R: 157 - Collect Implementation Monitoring Data on Culvert Replacements
- Project: 2007-395-00, Contract: 55332, Work Statement Element: Work Element S: 157 - Collect Baseline Data on Roads to be Removed, and Monitor Already Removed Roads
- Project: 2007-395-00, Contract: 55332, Work Statement Element: Work Element T: 160 - Input Road, Weed and Culvert Data
- Project: 2007-395-00, Contract: 55332, Work Statement Element: Work Element U: 162 - Analysis of Road, Weed and Culvert Data
- Project: 2007-395-00, Contract: 63419, Work Statement Element: Work Element M: 160 - Input & Analyze Road, Weed, and Culvert Data
- Project: 2002-072-00, Contract: 55061, Work Statement Element: Work Element P: 157 - Decommissioned/Improved Roads Data Collection
- Project: 2002-072-00, Contract: 55061, Work Statement Element: Work Element Q: 157 - Culvert and Bridge Replacement/Removal Data Collection
- Project: 2002-072-00, Contract: 55061, Work Statement Element: Work Element R: 157 - Stream Habitat Data Collection
- Project: 2002-072-00, Contract: 55061, Work Statement Element: Work Element S: 162 - Condition/Health of Red River
- Project: 2010-086-00, Contract: 55672, Work Statement Element: Work Element O: 157 - Culvert/Bridge Replacement and Removal Data Collection
- Project: 2010-086-00, Contract: 55672, Work Statement Element: Work Element Q: 157 - Stream Habitat and Metals Monitoring Data Collection
- Project: 2007-393-00, Contract: 65343, Work Statement Element: Work Element F: 160 - Maintain records of projects
- Project: 2002-068-00, Contract: 65342, Work Statement Element: Work Element B: 157 - Partial Barrier AEM MBACI data collection
- Project: 2002-068-00, Contract: 65342, Work Statement Element: Work Element C: 157 - Bank Stabilization AEM MBACI data collection
- Project: 2002-068-00, Contract: 65342, Work Statement Element: Work Element D: 157 - Floodplain/Channel Restoration AEM MBACI data collection
- Project: 2007-395-00, Contract: 67015, Work Statement Element: Work Element M: 160 - Input & Analyze Road, Weed, and Culvert Data
- Project: 2002-068-00, Contract: 68859, Work Statement Element: Work Element B: 157 - Partial Barrier AEM MBACI data collection
- Project: 2002-068-00, Contract: 68859, Work Statement Element: Work Element C: 157 - Bank Stabilization AEM MBACI data collection
- Project: 2002-068-00, Contract: 68859, Work Statement Element: Work Element D: 157 - Floodplain/Channel Restoration AEM MBACI data collection
- Project: 2007-393-00, Contract: 68905, Work Statement Element: Work Element F: 160 - Maintain records of projects
- Project: 2002-068-00, Contract: 72747, Work Statement Element: Work Element B: 157 - Partial Barrier AEM MBACI data collection
- Project: 2002-068-00, Contract: 72747, Work Statement Element: Work Element C: 157 - Bank Stabilization AEM MBACI data collection
- Project: 2002-068-00, Contract: 72747, Work Statement Element: Work Element D: 157 - Floodplain/Channel Restoration AEM MBACI data collection
- Project: 2007-395-00, Contract: 75023, Work Statement Element: Work Element O: 160 - Input & Analyze Road, Weed, and Culvert Data
- Project: 2007-393-00, Contract: 72673, Work Statement Element: Work Element F: 160 - Maintain records of projects
- Project: 2007-395-00, Contract: 71057, Work Statement Element: Work Element O: 160 - Input & Analyze Road, Weed, and Culvert Data
- Project: 2002-068-00, Contract: 76148, Work Statement Element: Work Element B: 157 - Partial Barrier AEM MBACI data collection
- Project: 2002-068-00, Contract: 76148, Work Statement Element: Work Element C: 157 - Bank Stabilization AEM MBACI data collection
- Project: 2002-068-00, Contract: 76148, Work Statement Element: Work Element D: 157 - Floodplain/Channel Restoration AEM MBACI data collection
- Project: 1997-030-00, Contract: 74017 REL 4, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Habitat Data Analysis: Sp/Su Chinook salmon, Secesh; Steelhead, Joseph
- Project: 1997-030-00, Contract: 74547, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Habitat Data Analysis: Sp/Su Chinook salmon, Secesh; Steelhead, Joseph
- Project: 2007-395-00, Contract: 74017 REL 21, Work Statement Element: Work Element N: 160 - Input & Analyze Road, Weed, and Culvert Data
- Project: 1997-030-00, Contract: CR-323536, Work Statement Element: Work Element M: 162 - COPY: Nez Perce Tribe Habitat Data Analysis: Sp/Su Chinook salmon, Secesh; Steelhead, Joseph
- Project: 2007-395-00, Contract: 81472, Work Statement Element: Work Element N: 160 - Input & Analyze Road, Weed, and Culvert Data
- Project: 2002-068-00, Contract: 74017 REL 46, Work Statement Element: Work Element C: 157 - Floodplain Reconnection data collection
- Project: 2002-068-00, Contract: 74017 REL 46, Work Statement Element: Work Element E: 157 - SF Clearwater River data collection
- Project: 2002-068-00, Contract: 74017 REL 46, Work Statement Element: Work Element B: 157 - Partial Barrier data collection
- Project: 2002-068-00, Contract: 74017 REL 66, Work Statement Element: Work Element B: 157 - Partial Barrier data collection
- Project: 2002-068-00, Contract: 74017 REL 66, Work Statement Element: Work Element C: 157 - Floodplain Reconnection data collection
- Project: 2002-068-00, Contract: 74017 REL 66, Work Statement Element: Work Element E: 157 - eDNA data collection
- Project: 2002-068-00, Contract: 74017 REL 66, Work Statement Element: Work Element D: 157 - Backpack electrofishing data collection
- Project: 2010-057-00, Contract: 74017 REL 62, Work Statement Element: Work Element K: 157 - Optional: Joseph Creek Single Pass Steelhead Spawner Survey
- Project: 2002-068-00, Contract: 74017 REL 85, Work Statement Element: Work Element B: 157 - Partial Barrier data collection
- Project: 2002-068-00, Contract: 74017 REL 85, Work Statement Element: Work Element C: 157 - Floodplain Reconnection data collection
- Project: 2002-068-00, Contract: 74017 REL 85, Work Statement Element: Work Element D: 157 - Backpack electrofishing data collection
- Project: 2002-068-00, Contract: 74017 REL 85, Work Statement Element: Work Element E: 157 - eDNA data collection
- Project: 2002-068-00, Contract: 74017 REL 104, Work Statement Element: Work Element C: 157 - Partial Barrier data collection
- Project: 2002-068-00, Contract: 74017 REL 104, Work Statement Element: Work Element D: 157 - Floodplain Reconnection data collection
- Project: 2002-068-00, Contract: 74017 REL 104, Work Statement Element: Work Element E: 157 - Backpack Electrofishing data collection
- Project: 2002-068-00, Contract: 74017 REL 104, Work Statement Element: Work Element F: 157 - eDNA data collection
- Project: 2002-068-00, Contract: 74017 REL 104, Work Statement Element: Work Element G: 157 - In-Channel Wood Placement data collection
- Project: 2002-068-00, Contract: 74017 REL 104, Work Statement Element: Work Element H: 157 - Aquatic Habitat data collection
- Project: 1996-077-02, Contract: 21712, Work Statement Element: Work Element R: 157 - Stream Habitat Data Collection
- Project: 2000-035-00, Contract: 22930, Work Statement Element: Work Element G: 157 - Removed roads data collection
- Project: 1996-077-02, Contract: 26390, Work Statement Element: Work Element M: 157 - Stream Habitat Data Collection
- Project: 2000-035-00, Contract: 28845, Work Statement Element: Work Element C: 157 - Removed roads data collection
- Project: 2000-035-00, Contract: 28845, Work Statement Element: Work Element E: 157 - Stream Habitat Data Collection
- Project: 2002-072-00, Contract: 28922, Work Statement Element: Work Element F: 157 - Stream Habitat Data Collection
- Project: 1996-077-02, Contract: 31552, Work Statement Element: Work Element K: 157 - Stream Habitat Data Collection
- Project: 2007-395-00, Contract: 32869, Work Statement Element: Work Element J: 157 - Collect Baseline Data on Roads to be Removed, and Monitor Already Removed Roads
- Project: 2007-395-00, Contract: 32869, Work Statement Element: Work Element K: 157 - Collect Monitoring Data for Weed Treatment
- Project: 2007-395-00, Contract: 32869, Work Statement Element: Work Element L: 157 - Collect Implementation Monitoring Data on Culvert Replacements
- Project: 2000-035-00, Contract: 35879, Work Statement Element: Work Element D: 157 - Removed roads data collection
- Project: 2000-035-00, Contract: 35879, Work Statement Element: Work Element E: 157 - Stream Habitat Data Collection
- Project: 2002-072-00, Contract: 35863, Work Statement Element: Work Element G: 157 - Stream Habitat Data Collection
- Project: 1996-077-02, Contract: 36513, Work Statement Element: Work Element I: 157 - Stream Habitat Data Collection
- Project: 2007-395-00, Contract: 37499, Work Statement Element: Work Element H: 157 - Collect Baseline Data on Roads to be Removed, and Monitor Already Removed Roads
- Project: 2007-395-00, Contract: 37499, Work Statement Element: Work Element I: 157 - Collect Monitoring Data for Weed Treatment
- Project: 2007-395-00, Contract: 37499, Work Statement Element: Work Element J: 157 - Collect Implementation Monitoring Data on Culvert Replacements
- Project: 2000-035-00, Contract: 39822, Work Statement Element: Work Element D: 157 - Removed roads data collection
- Project: 2000-035-00, Contract: 39822, Work Statement Element: Work Element E: 157 - Stream Habitat Data Collection
- Project: 2002-072-00, Contract: 39823, Work Statement Element: Work Element F: 157 - Stream Habitat Data Collection
- Project: 1996-077-02, Contract: 41152, Work Statement Element: Work Element K: 157 - Stream Habitat Data Collection
- Project: 2007-395-00, Contract: 42646, Work Statement Element: Work Element AC: 157 - Collect Baseline Data on Roads to be Removed, and Monitor Already Removed Roads
- Project: 2007-395-00, Contract: 42646, Work Statement Element: Work Element AA: 157 - Collect Monitoring Data for Weed Treatment
- Project: 2007-395-00, Contract: 42646, Work Statement Element: Work Element AB: 157 - Collect Implementation Monitoring Data on Culvert Replacements
- Project: 2000-035-00, Contract: 45425, Work Statement Element: Work Element I: 157 - Removed roads data collection
- Project: 2000-035-00, Contract: 45425, Work Statement Element: Work Element J: 157 - Stream Habitat Data Collection
- Project: 1996-077-02, Contract: 46105, Work Statement Element: Work Element K: 157 - Stream Habitat Data Collection
- Project: 2002-072-00, Contract: 45427, Work Statement Element: Work Element J: 157 - Stream Habitat Data Collection
- Project: 2007-127-00, Contract: 52253, Work Statement Element: Work Element L: 157 - Effectiveness Monitoring Data for Road Decommissioning and Stream Crossing AOP Projects
- Project: 2007-395-00, Contract: 42646, Work Statement Element: Work Element R: 157 - AMEND Collect Monitoring Data for Weed Treatment
- Project: 2007-395-00, Contract: 42646, Work Statement Element: Work Element AS: 157 - AMEND Collect Implementation Monitoring Data on Culvert Replacements
- Project: 2007-395-00, Contract: 42646, Work Statement Element: Work Element AT: 157 - AMEND Collect Baseline Data on Roads to be Removed, and Monitor Already Removed Roads
- Project: 2010-057-00, Contract: 74546, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Distribution Data Analysis: Snake River B-Run Steelhead SFCWR
- Project: 2010-057-00, Contract: 74546, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Steelhead SFCWR, Newsome Cr., Lolo Cr.
- Project: 1996-043-00, Contract: 74742, Work Statement Element: Work Element K: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: Secesh Steelhead
- Project: 1996-043-00, Contract: 74742, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Pops
- Project: 1996-043-00, Contract: 74742, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Distribution Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74742, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Pops.
- Project: 1997-030-00, Contract: 74547, Work Statement Element: Work Element G: 157 - Nez Perce Tribe Adult Weir Data Collection: Steelhead, Joseph Creek
- Project: 1983-350-03, Contract: 75398, Work Statement Element: Work Element W: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Spring Chinook. Lolo & Newsome Cr.
- Project: 1998-007-02, Contract: 74668, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 74668, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River
- Project: 1983-350-03, Contract: 75398, Work Statement Element: Work Element Y: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis - Spring Chinook, Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 75398, Work Statement Element: Work Element AA: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lolo & Newsome Cr.
- Project: 1998-007-02, Contract: 74668, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River
- Project: 1983-350-03, Contract: 75398, Work Statement Element: Work Element AC: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook, Lolo and Newsome Cr.
- Project: 1998-007-02, Contract: 74668, Work Statement Element: Work Element T: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River
- Project: 2010-032-00, Contract: 74659, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 2010-032-00, Contract: 74659, Work Statement Element: Work Element K: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 1997-015-01, Contract: 74666, Work Statement Element: Work Element H: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74666, Work Statement Element: Work Element I: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1983-350-03, Contract: 75398, Work Statement Element: Work Element Z: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 75398, Work Statement Element: Work Element X: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Fall Chinook Clearwater R.
- Project: 1983-350-03, Contract: 75398, Work Statement Element: Work Element AB: 162 - Nez Perce Tribe Distribution Data Analysis: Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 75398, Work Statement Element: Work Element AD: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Fall Chinook Snake River Basin
- Project: 1998-007-02, Contract: 74668, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River
- Project: 1996-043-00, Contract: 74742, Work Statement Element: Work Element J: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: EFSFSR and Secesh Sp/Su Chinook
- Project: 1997-030-00, Contract: 74017 REL 4, Work Statement Element: Work Element G: 157 - Nez Perce Tribe Adult Weir Data Collection: Steelhead, Joseph Creek
- Project: 2010-032-00, Contract: 74017 REL 5, Work Statement Element: Work Element K: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 2010-032-00, Contract: 74017 REL 5, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 2010-057-00, Contract: 74017 REL 14, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Distribution Data Analysis: Snake River B-Run Steelhead SFCWR
- Project: 2010-057-00, Contract: 74017 REL 14, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Steelhead SFCWR, Newsome Cr., Lolo Cr.
- Project: 1997-015-01, Contract: 74017 REL 6, Work Statement Element: Work Element H: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74017 REL 6, Work Statement Element: Work Element I: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1996-043-00, Contract: 74017 REL 10, Work Statement Element: Work Element K: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: EFSFSR and Secesh Sp/Su Chinook
- Project: 1996-043-00, Contract: 74017 REL 10, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: Secesh Steelhead
- Project: 1996-043-00, Contract: 74017 REL 10, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 10, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Distribution Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 10, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1998-007-02, Contract: 74017 REL 8, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 74017 REL 8, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 74017 REL 8, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River
- Project: 1998-007-02, Contract: 74017 REL 8, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive
- Project: 1998-007-02, Contract: 74017 REL 8, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River
- Project: 1983-350-03, Contract: 74017 REL 16, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Spring Chinook. Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 74017 REL 16, Work Statement Element: Work Element T: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Fall Chinook Clearwater R.
- Project: 1983-350-03, Contract: 74017 REL 16, Work Statement Element: Work Element U: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis - Spring Chinook, Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 74017 REL 16, Work Statement Element: Work Element V: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 74017 REL 16, Work Statement Element: Work Element W: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 74017 REL 16, Work Statement Element: Work Element X: 162 - Nez Perce Tribe Distribution Data Analysis: Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 74017 REL 16, Work Statement Element: Work Element Y: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook, Lolo and Newsome Cr.
- Project: 1983-350-03, Contract: 74017 REL 16, Work Statement Element: Work Element Z: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Fall Chinook Snake River Basin
- Project: 2002-068-00, Contract: 74017 REL 23, Work Statement Element: Work Element B: 157 - Partial Barrier AEM MBACI data collection
- Project: 2002-068-00, Contract: 74017 REL 23, Work Statement Element: Work Element D: 157 - Floodplain/Channel Restoration AEM MBACI data collection
- Project: 2010-032-00, Contract: CR-323533, Work Statement Element: Work Element K: 162 - COPY: Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 2010-032-00, Contract: CR-323533, Work Statement Element: Work Element L: 162 - COPY: Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 1997-030-00, Contract: CR-323536, Work Statement Element: Work Element F: 157 - COPY: Nez Perce Tribe Adult Weir Data Collection: Steelhead, Joseph Creek
- Project: 1997-015-01, Contract: 74017 REL 36, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74017 REL 36, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1996-043-00, Contract: 74017 REL 30, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: EFSFSR and Secesh Sp/Su Chinook
- Project: 1996-043-00, Contract: 74017 REL 30, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: Secesh Steelhead
- Project: 1996-043-00, Contract: 74017 REL 30, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 30, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Distribution Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 30, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1983-350-03, Contract: 74017 REL 38, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Spring Chinook. Lolo Creek & South Fork Clearwater River.
- Project: 1983-350-03, Contract: 74017 REL 38, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Fall Chinook Clearwater R.
- Project: 1983-350-03, Contract: 74017 REL 38, Work Statement Element: Work Element T: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis - Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 74017 REL 38, Work Statement Element: Work Element U: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 74017 REL 38, Work Statement Element: Work Element V: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 74017 REL 38, Work Statement Element: Work Element W: 162 - Nez Perce Tribe Distribution Data Analysis: Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 74017 REL 38, Work Statement Element: Work Element X: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 74017 REL 38, Work Statement Element: Work Element Y: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Fall Chinook Snake River Basin
- Project: 1998-007-02, Contract: 74017 REL 42, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 74017 REL 42, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 74017 REL 42, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River
- Project: 1998-007-02, Contract: 74017 REL 42, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive
- Project: 1998-007-02, Contract: 74017 REL 42, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River
- Project: 2010-057-00, Contract: 74017 REL 34, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Clearwater River Steelhead
- Project: 2010-057-00, Contract: 74017 REL 34, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Steelhead SFCWR, Newsome Cr., Lolo Cr.
- Project: 2010-032-00, Contract: CR-323533, Work Statement Element: Work Element U: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 2010-032-00, Contract: CR-323533, Work Statement Element: Work Element V: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74017 REL 36, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 1997-015-01, Contract: 74017 REL 36, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 1997-015-01, Contract: 74017 REL 56, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74017 REL 56, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74017 REL 56, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 1997-015-01, Contract: 74017 REL 56, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 1996-043-00, Contract: 74017 REL 53, Work Statement Element: Work Element K: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: EFSFSR and Secesh Sp/Su Chinook
- Project: 1996-043-00, Contract: 74017 REL 53, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: Secesh Steelhead
- Project: 1996-043-00, Contract: 74017 REL 53, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 53, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Distribution Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 53, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1983-350-03, Contract: 83853, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Spring Chinook. Lolo Creek & South Fork Clearwater River.
- Project: 1983-350-03, Contract: 83853, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Fall Chinook Clearwater R.
- Project: 1983-350-03, Contract: 83853, Work Statement Element: Work Element T: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis - Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 83853, Work Statement Element: Work Element U: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 83853, Work Statement Element: Work Element V: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 83853, Work Statement Element: Work Element W: 162 - Nez Perce Tribe Distribution Data Analysis: Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 83853, Work Statement Element: Work Element X: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 83853, Work Statement Element: Work Element Y: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Fall Chinook Snake River Basin
- Project: 2010-057-00, Contract: 74017 REL 62, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Clearwater River Steelhead
- Project: 2010-057-00, Contract: 74017 REL 62, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Steelhead SFCWR, Newsome Cr., Lolo Cr.
- Project: 1998-007-02, Contract: 83821, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 83821, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 83821, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River
- Project: 1998-007-02, Contract: 83821, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive
- Project: 1998-007-02, Contract: 83821, Work Statement Element: Work Element T: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River
- Project: 2010-057-00, Contract: 74017 REL 62, Work Statement Element: Work Element I: 157 - Optional: Nez Perce Tribe Adult Weir Data Collection and Spawner Surveys: Steelhead, Joseph Creek
- Project: 1997-015-01, Contract: 74017 REL 72, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74017 REL 72, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74017 REL 72, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 1997-015-01, Contract: 74017 REL 72, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 1996-043-00, Contract: 74017 REL 75, Work Statement Element: Work Element K: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: EFSFSR and Secesh Sp/Su Chinook
- Project: 1996-043-00, Contract: 74017 REL 75, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: Secesh Steelhead
- Project: 1996-043-00, Contract: 74017 REL 75, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 75, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Distribution Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 75, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1983-350-03, Contract: 86929, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Spring Chinook. Lolo Creek & South Fork Clearwater River.
- Project: 1983-350-03, Contract: 86929, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Fall Chinook Clearwater R.
- Project: 1983-350-03, Contract: 86929, Work Statement Element: Work Element T: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis - Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 86929, Work Statement Element: Work Element U: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 86929, Work Statement Element: Work Element V: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 86929, Work Statement Element: Work Element W: 162 - Nez Perce Tribe Distribution Data Analysis: Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 86929, Work Statement Element: Work Element X: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 86929, Work Statement Element: Work Element Y: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Fall Chinook Snake River Basin
- Project: 2010-057-00, Contract: 74017 REL 73, Work Statement Element: Work Element F: 157 - Nez Perce Tribe Adult Weir Data Collection: Relative Abundance and Distribution Monitoring
- Project: 2010-057-00, Contract: 74017 REL 73, Work Statement Element: Work Element G: 157 - Optional: Nez Perce Tribe Adult Weir Data Collection: Steelhead, Joseph Creek
- Project: 2010-057-00, Contract: 74017 REL 73, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: South Fork Clearwater R. and Lolo Cr. Steelhead
- Project: 1998-007-02, Contract: 86723, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 86723, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 86723, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River
- Project: 1998-007-02, Contract: 86723, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive
- Project: 1998-007-02, Contract: 86723, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River
- Project: 1997-015-01, Contract: 74017 REL 91, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74017 REL 91, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 74017 REL 91, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 1997-015-01, Contract: 74017 REL 91, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 1996-043-00, Contract: 74017 REL 94, Work Statement Element: Work Element J: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: EFSFSR and Secesh Sp/Su Chinook
- Project: 1996-043-00, Contract: 74017 REL 94, Work Statement Element: Work Element K: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: Secesh Steelhead
- Project: 1996-043-00, Contract: 74017 REL 94, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 94, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Distribution Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 74017 REL 94, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1983-350-03, Contract: 89434, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Spring Chinook. Lolo Creek & South Fork Clearwater River.
- Project: 1983-350-03, Contract: 89434, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Fall Chinook Clearwater R.
- Project: 1983-350-03, Contract: 89434, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis - Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 89434, Work Statement Element: Work Element T: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 89434, Work Statement Element: Work Element U: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 89434, Work Statement Element: Work Element V: 162 - Nez Perce Tribe Distribution Data Analysis: Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 89434, Work Statement Element: Work Element W: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 89434, Work Statement Element: Work Element X: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Fall Chinook Snake River Basin
- Project: 1998-007-02, Contract: 89446, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 89446, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 89446, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River
- Project: 1998-007-02, Contract: 89446, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive
- Project: 1998-007-02, Contract: 89446, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River
- Project: 2010-057-00, Contract: 74017 REL 90, Work Statement Element: Work Element F: 157 - Nez Perce Tribe Adult Weir Data Collection: Relative Abundance and Distribution Monitoring
- Project: 2010-057-00, Contract: 74017 REL 90, Work Statement Element: Work Element G: 157 - Optional: Nez Perce Tribe Adult Weir Data Collection: Steelhead, Joseph Creek
- Project: 2010-057-00, Contract: 74017 REL 90, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: South Fork Clearwater R. and Lolo Cr. Steelhead
- Project: 1997-015-01, Contract: 84044 REL 7, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 84044 REL 7, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 84044 REL 7, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 1997-015-01, Contract: 84044 REL 7, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 1983-350-03, Contract: 84044 REL 4, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Spring Chinook. Lolo Creek & South Fork Clearwater River.
- Project: 1983-350-03, Contract: 84044 REL 4, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Fall Chinook Clearwater R.
- Project: 1983-350-03, Contract: 84044 REL 4, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis - Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 84044 REL 4, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 84044 REL 4, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 84044 REL 4, Work Statement Element: Work Element T: 162 - Nez Perce Tribe Distribution Data Analysis: Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 84044 REL 4, Work Statement Element: Work Element U: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 84044 REL 4, Work Statement Element: Work Element V: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Fall Chinook Snake River Basin
- Project: 1996-043-00, Contract: 84044 REL 3, Work Statement Element: Work Element J: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: EFSFSR and Secesh Sp/Su Chinook
- Project: 1996-043-00, Contract: 84044 REL 3, Work Statement Element: Work Element K: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: Secesh Steelhead
- Project: 1996-043-00, Contract: 84044 REL 3, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 84044 REL 3, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Distribution Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 84044 REL 3, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1998-007-02, Contract: 84044 REL 5, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 84044 REL 5, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 84044 REL 5, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River
- Project: 1998-007-02, Contract: 84044 REL 5, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive
- Project: 1998-007-02, Contract: 84044 REL 5, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River
- Project: 2010-057-00, Contract: 84044 REL 8, Work Statement Element: Work Element J: 157 - Nez Perce Tribe Adult Weir Data Collection: Relative Abundance and Distribution Monitoring
- Project: 2010-057-00, Contract: 84044 REL 8, Work Statement Element: Work Element L: 157 - Optional: Nez Perce Tribe Adult Weir Data Collection: Steelhead, Joseph Creek
- Project: 2010-057-00, Contract: 84044 REL 8, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: South Fork Clearwater R. and Lolo Cr. Steelhead
- Project: 2002-068-00, Contract: 84044 REL 18, Work Statement Element: Work Element C: 157 - Backpack Electrofishing data collection
- Project: 2002-068-00, Contract: 84044 REL 18, Work Statement Element: Work Element D: 157 - Aquatic Habitat data collection
- Project: 1997-015-01, Contract: 84044 REL 29, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 84044 REL 29, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: 84044 REL 29, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 1997-015-01, Contract: 84044 REL 29, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 2010-057-00, Contract: 84044 REL 35, Work Statement Element: Work Element J: 157 - Nez Perce Tribe Adult Weir Data Collection: Relative Abundance and Distribution Monitoring
- Project: 2010-057-00, Contract: 84044 REL 35, Work Statement Element: Work Element L: 157 - Optional: Nez Perce Tribe Adult Weir Data Collection: Steelhead, Joseph Creek
- Project: 2010-057-00, Contract: 84044 REL 35, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: South Fork Clearwater R. and Lolo Cr. Steelhead
- Project: 1983-350-03, Contract: 84044 REL 33, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Spring Chinook. Lolo Creek & South Fork Clearwater River.
- Project: 1983-350-03, Contract: 84044 REL 33, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis Fall Chinook Clearwater R.
- Project: 1983-350-03, Contract: 84044 REL 33, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis - Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 84044 REL 33, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 84044 REL 33, Work Statement Element: Work Element S: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lolo & Newsome Cr.
- Project: 1983-350-03, Contract: 84044 REL 33, Work Statement Element: Work Element T: 162 - Nez Perce Tribe Distribution Data Analysis: Fall Chinook Snake River Basin
- Project: 1983-350-03, Contract: 84044 REL 33, Work Statement Element: Work Element U: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook, Lolo Creek.
- Project: 1983-350-03, Contract: 84044 REL 33, Work Statement Element: Work Element V: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Fall Chinook Snake River Basin
- Project: 1996-043-00, Contract: 84044 REL 34, Work Statement Element: Work Element J: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: EFSFSR and Secesh Sp/Su Chinook
- Project: 1996-043-00, Contract: 84044 REL 34, Work Statement Element: Work Element K: 162 - Nez Perce Tribe Juvenile Abundance & Life History Analysis: Secesh Steelhead
- Project: 1996-043-00, Contract: 84044 REL 34, Work Statement Element: Work Element L: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 84044 REL 34, Work Statement Element: Work Element M: 162 - Nez Perce Tribe Distribution Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1996-043-00, Contract: 84044 REL 34, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Sp/Sum Chinook, EFSFSR & Secesh Populations
- Project: 1998-007-02, Contract: 84044 REL 30, Work Statement Element: Work Element N: 162 - Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 84044 REL 30, Work Statement Element: Work Element O: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River
- Project: 1998-007-02, Contract: 84044 REL 30, Work Statement Element: Work Element P: 162 - Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River
- Project: 1998-007-02, Contract: 84044 REL 30, Work Statement Element: Work Element Q: 162 - Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive
- Project: 1998-007-02, Contract: 84044 REL 30, Work Statement Element: Work Element R: 162 - Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River
- Project: 2002-068-00, Contract: 84044 REL 46, Work Statement Element: Work Element D: 157 - Backpack electrofishing data collection
- Project: 2002-068-00, Contract: 84044 REL 46, Work Statement Element: Work Element E: 157 - Aquatic Habitat data collection
- Project: 2002-068-00, Contract: 84044 REL 46, Work Statement Element: Work Element C: 157 - Snorkel survey data collection
- Project: 1997-015-01, Contract: CR-373239, Work Statement Element: Work Element M: 162 - COPY: Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: CR-373239, Work Statement Element: Work Element N: 162 - COPY: Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Chinook and Steelhead
- Project: 1997-015-01, Contract: CR-373239, Work Statement Element: Work Element Q: 162 - COPY: Nez Perce Tribe Survival and Productivity Data Analysis: Imnaha Steelhead
- Project: 1997-015-01, Contract: CR-373239, Work Statement Element: Work Element R: 162 - COPY: Nez Perce Tribe Distribution Data Analysis: Imnaha Steelhead
- Project: 2002-068-00, Contract: 84044 REL 62, Work Statement Element: Work Element D: 157 - Backpack electrofishing data collection
- Project: 2002-068-00, Contract: 84044 REL 62, Work Statement Element: Work Element E: 157 - Aquatic Habitat data collection
- Project: 2002-068-00, Contract: 84044 REL 62, Work Statement Element: Work Element C: 157 - Snorkel survey data collection